Qtutor Guide

Class 10 Maths Model Question Paper 2026-27 Set 19 with Solutions PDF

See every paper in this set: Model Question Papers 2026-27 (Class 10 Mathematics) →

CBSE Class 10 Maths Model Question Paper 2026-27 – Set 19 with Detailed Solutions (PDF · 24 pages · ₹49) Buy the full PDF for ₹49

Preview: first 2 pages

CBSE Class 10 Maths Model Question Paper 2026-27 – Set 19 with Detailed Solutions PDF, page 1
CBSE Class 10 Maths Model Question Paper 2026-27 – Set 19 with Detailed Solutions PDF, page 2

Free sample: pages 1 to 2 of 24. The full PDF costs ₹49.

For Class 10 students who want one more full-length rehearsal before the board exam, and for teachers who need a ready mock test, this 24-page PDF is Set 19 of the 20-set Qtutor CBSE Class 10 Maths Model Question Paper 2026-27 series. It follows the Mathematics Standard (041) pattern: 38 questions, 80 marks, 3 hours. The word problems are set on a construction site: a crane hired by the hour, a roof truss and its scale drawing, an underground water tank, a concrete mixer drum and a contractor's daily wage bill. Set 19 costs Rs 49, while Set 1 is free. It is an independent Qtutor practice paper, not an official CBSE paper.

What is included

  • The question paper on pages 1 to 6, opening with the general instructions.
  • A detailed answer key and step-wise marking scheme on pages 7 to 24, covering both options of every internal choice.
  • A two-column layout in the key: the main solution on the left, a working and calculation column on the right, and the final answer highlighted.
  • A suggested marks table after each question from Section B onwards, showing where each mark is earned.

Paper pattern

SectionQuestionsTypeMarks
A1 to 2018 MCQs and 2 Assertion-Reason questions, 1 mark each20
B21 to 25Very short answer, 2 marks each10
C26 to 31Short answer, 3 marks each18
D32 to 35Long answer, 5 marks each20
E36 to 38Case study based, 4 marks each12

There is no overall choice; an internal choice is given in 2 questions of Section B, 2 of Section C, 2 of Section D and in the 2-mark sub-part of every case study in Section E.

Key topics covered

  • Real Numbers: composite numbers of floor tiles and cement bags, HCF and LCM of nut and bolt orders, and the proof that 2 sqrt(3) - 1 is irrational.
  • Polynomials: the parabolic arch of a bridge, and a slab with perimeter 34 m and diagonal 13 m.
  • Pair of Linear Equations: two crane hire plans and the wage bill case study.
  • Quadratic Equations: stiffener lengths in a beam design and the underground water tank.
  • Arithmetic Progressions: a chimney dismantled day by day, steel rods cut in multiples of 8 cm, and the angles of a quadrilateral plot.
  • Triangles: a roof truss and its scale model, ramp supports and similar brackets.
  • Coordinate Geometry: an equilateral steel frame, a crane hook on a cable and a conveyor belt.
  • Trigonometry and Heights and Distances: an A-frame scaffold, a crane jib, identity proofs, a rising building and a crane boom.
  • Circles and Areas Related to Circles: an incircle proof, the V-block case study, a concrete slab, a manhole and a sector of a model platform.
  • Surface Areas and Volumes: a cone carved from a concrete cube, a decorative pillar and a mixer drum made of two cones.
  • Statistics and Probability: a corrected mean of rod lengths, concrete cube strengths, bricks laid per hour, safety helmets, and bolts and nuts.

Sample questions from this paper

Section A (1 mark). An old chimney is being dismantled from the top. Its heights (in m) at the end of successive days are 60, 57.5, 55, ... The height of the chimney at the end of the 12th day is: (A) 30 m (B) 32.5 m (C) 35 m (D) 31.25 m

Solution: AP with a = 60, d = -2.5. The 12th term is a + 11d = 60 - 27.5 = 32.5 m, so the answer is (B).

Section B (2 marks). A circular platform of radius 14 cm in a scale model is divided by two radii into a minor sector of angle 90 degrees and a major sector. Find the length of the major arc and the area of the major sector.

Solution: The major sector angle is 360 - 90 = 270 degrees. Major arc = (270/360) x 2 x 22/7 x 14 = 3/4 x 88 = 66 cm. Area of major sector = (270/360) x 22/7 x 14^2 = 3/4 x 616 = 462 cm^2.

Section C (3 marks). On a site grid, a straight conveyor belt runs from A(2, 3) to B(6, -3). A support is fixed on the belt at P(4, m). Find the ratio in which P divides AB and hence find the value of m.

Solution: Let P divide AB in the ratio k : 1. From the x-coordinates, 4 = (6k + 2)/(k + 1), so 4k + 4 = 6k + 2 and k = 1. The ratio is 1 : 1, so m = (3 + (-3))/2 = 0.

Section D (5 marks). The boom of a mobile crane is 24 m long and is hinged at a point 1.5 m above level ground. The boom is first inclined at 30 degrees to the horizontal and is then raised to 60 degrees. Find (i) the height of the tip above the ground in each position, (ii) how much the tip rises, and (iii) how far the tip moves horizontally towards the crane. (Use sqrt(3) = 1.732)

Solution: (i) At 30 degrees the height is 1.5 + 24 sin 30 = 1.5 + 12 = 13.5 m. At 60 degrees it is 1.5 + 24 sin 60 = 1.5 + 12 sqrt(3) = 1.5 + 20.784 = 22.284 m. (ii) Rise = 22.284 - 13.5 = 8.784 m. (iii) The tip is 24 cos 30 = 20.784 m from the hinge at first and 24 cos 60 = 12 m later, so it moves 20.784 - 12 = 8.784 m towards the crane.

Section E (4 marks). Productivity of Masons. A construction company recorded the number of bricks laid per hour by 50 masons: 20-40: 3, 40-60: 7, 60-80: 12, 80-100: 15, 100-120: 6, 120-140: 7. (ii) How many masons laid at least 80 bricks per hour? (iii)(A) Find the mode of the data.

Solution: (ii) 15 + 6 + 7 = 28 masons. (iii)(A) The modal class is 80-100, with l = 80, f1 = 15, f0 = 12, f2 = 6 and h = 20. Mode = 80 + (15 - 12)/(30 - 12 - 6) x 20 = 80 + 5 = 85 bricks per hour.

The other two case studies are Wage Bill at a Housing Project and Pipe on a V-Block.

How this paper helps

  • Q33 is a three-part similarity question: prove the truss similar to its drawing, find the rafters, then prove DE parallel to BC and find DE.
  • Section C asks three proofs: irrationality (Q26), the incircle mid-point result (Q29) and an identity (Q31).
  • The working column carries check lines, such as 6 x 4 x 1.5 = 36 for the tank in Q32 and the mid-point check (4, 0) in Q30.
  • Q34 trains unit handling: the pillar mixes cm and m, and the drum capacity is wanted in litres.

Who should use it

Class 10 Mathematics Standard students who have finished the syllabus and want a timed paper with a marking scheme, and teachers looking for a ready mock test.

Download the PDF

CBSE Class 10 Maths Model Question Paper 2026-27 – Set 19 with Detailed Solutions (PDF · 24 pages · ₹49)

More study materials for this chapter are on the chapter page.

To see the format first, try Set 1 (free).

Related resources

Frequently asked questions

Is Set 19 an official CBSE paper? No. It is an independent Qtutor practice paper; its step-wise marks are Qtutor's suggested breakdown.

What does Set 19 cost? Rs 49. Set 1 of the series is free.

What is the theme of this set? Construction sites: cranes, trusses, slabs, tanks, scaffolds and wages.

Which case studies are in Section E? Wage Bill at a Housing Project (Q36), Pipe on a V-Block (Q37) and Productivity of Masons (Q38).

How are the 24 pages divided? Pages 1 to 6 are the question paper and pages 7 to 24 are the answer key and marking scheme.

Build your exam confidence with Set 19

Attempt the paper in one 3-hour sitting, mark it with the key, and find more Class 10 material on CBSEStudyMaterials.com.

More PDFs in this set

Browse CBSE study materials by class

Guides